How it is worked out
Fill to order = length × width × (depth ÷ 12) ÷ 27 × (1 + compaction allowance)
A worked example
An area 20 by 10 feet filled 6 inches deep is 3.7 cubic yards in place. With 20% for compaction, order 4.4 yards.
Good to know
- Place fill in thin layers and compact each one. Fill dumped in one deep lift settles for years.
- Fill under a slab or a building needs to meet the engineer's or the code's compaction standard.
- Sandy fill packs less than clay. Ask the pit what they allow for theirs.
How we know this calculator is right
Before this calculator went on the site, 7 answers were worked out separately from its code, by hand or straight from the formula above. Each time this page loads, your own browser runs the calculator on those same numbers and compares. Turn on JavaScript to see the comparison.
See every check
| Numbers used | Result | Worked out separately | This calculator |
|---|
What this proves: the calculator does the arithmetic of the formula shown, correctly. What it cannot prove: your measurements, or figures such as coverage per bag, waste and spacing, which are typical starting values you can change. Go by the product label and your local code.