How the count is worked out
Each course of shingles gets its own piece of step flashing, tucked under the shingle above and lapped over the one below. Divide the length along the slope by the shingle exposure.
Step flashing pieces = length along the slope × 12 ÷ shingle exposure × (1 + waste)
A worked example
A roof that runs 20 feet up the side of a wall is 240 inches. At 5 inches of exposure that is 48 courses, so 48 pieces. With 10% spare you buy 53.
Good to know
- Step flashing is sold in bundles, often of 50 or 100, in sizes such as 5 by 7 or 8 by 8 inches.
- Never use one long strip in place of stepped pieces on a shingle roof. Water gets behind it.
- A chimney also needs an apron at the front, a back pan or cricket, and counter flashing let into the masonry.
- Valley metal is overlapped by several inches where pieces meet, which is what the waste allowance covers.
Common questions
Should I reuse old flashing on a re-roof?
Most roofers replace step flashing when the shingles come off. It is cheap, and old pieces are usually bent or holed by the old nails.
How we know this calculator is right
Before this calculator went on the site, 7 answers were worked out separately from its code, by hand or straight from the formula above. Each time this page loads, your own browser runs the calculator on those same numbers and compares. Turn on JavaScript to see the comparison.
See every check
| Numbers used | Result | Worked out separately | This calculator |
|---|
What this proves: the calculator does the arithmetic of the formula shown, correctly. What it cannot prove: your measurements, or figures such as coverage per bag, waste and spacing, which are typical starting values you can change. Go by the product label and your local code.