How labor cost is worked out
Multiply workers by hours by days to get labor hours. Multiply by the wage, then add the burden.
Labor cost = workers × hours × days × wage × (1 + burden)
A worked example
Three workers for five 8 hour days is 120 labor hours. At $30 an hour that is $3,600 in wages. A 30% burden adds $1,080, so the job costs $4,680 in labor. Each hour really costs you $39, not $30.
Good to know
- Bid from the true cost per hour. Pricing from the bare wage leaves the taxes and insurance to come out of your profit.
- Workers compensation rates vary widely by trade. Roofing is among the highest, so a roofer's burden can be well above 30%.
- Not every paid hour is productive. Travel, setup, cleanup and weather all take time, so pad the hours.
- This is your cost, not your price. Add overhead and profit with the markup and margin calculator.
Common questions
How do I work out my own burden rate?
Add up a year of payroll taxes, workers compensation, liability insurance tied to payroll, and benefits. Divide by the year's gross wages.
What about subcontractors?
Their price already includes their own labor burden. Enter them as a cost in your bid, not here.
How we know this calculator is right
Before this calculator went on the site, 10 answers were worked out separately from its code, by hand or straight from the formula above. Each time this page loads, your own browser runs the calculator on those same numbers and compares. Turn on JavaScript to see the comparison.
See every check
| Numbers used | Result | Worked out separately | This calculator |
|---|
What this proves: the calculator does the arithmetic of the formula shown, correctly. What it cannot prove: your measurements, or figures such as coverage per bag, waste and spacing, which are typical starting values you can change. Go by the product label and your local code.