Enter the size of a slab and the spacing of the grid to find how many bars you need each way, how many sticks to buy and what it all weighs.

Example: The plans call for #4 bar at 12 inches each way in a driveway slab. Get the stick count and the weight for delivery.

Your numbers

Bars are laid in a grid in both directions and kept back from the edge of the slab.

ft
ft
in
12, 16 or 18 inches is typical.
in
ft
%
Drawn from your numbers. It redraws as you type.
  • Sticks to buy0
  • Bars running lengthwise0
  • Bars running across0
  • Total bar length0
  • Weight0
  • Crossings to tie0

Rebar calculator. Estimate from everysinglecalculator.com

Materials list
ItemBuyHow it was worked out

How the bar count is worked out

Take the edge distance off both sides, divide what is left by the spacing and add one for the first bar. Do that in each direction.

Bars = (slab width − 2 × edge distance) ÷ spacing, rounded down, + 1

A worked example

A slab 20 by 10 feet with bars 12 inches apart and 3 inches back from the edge has 10 bars running lengthwise, each 19½ feet long, and 20 bars running across, each 9½ feet long. That is 385 feet of bar. With 10% for laps and waste you buy 22 sticks of 20 feet. In #4 bar it weighs about 257 pounds, and there are 200 crossings to tie.

Good to know

  • Bar size and spacing come from your plans or code. This calculator counts the bars once you know them.
  • Where two bars join end to end they must overlap. A common rule is 40 times the bar diameter, which is 20 inches for #4.
  • Rebar only works if it is inside the concrete. Hold it up off the ground on chairs or dobies, roughly in the middle of the slab or as the plans show.
  • Weights per foot are 0.376 lb for #3, 0.668 lb for #4 and 1.043 lb for #5.

Common questions

Do I need rebar or wire mesh?

Light slabs such as paths and patios often use welded wire mesh. Driveways, footings and structural slabs usually call for rebar. Your code or engineer decides.

Do I tie every crossing?

Not always. Many crews tie every other crossing in the middle of a mat and every one at the edges, enough to stop the bars moving during the pour.

How we know this calculator is right

Before this calculator went on the site, 11 answers were worked out separately from its code, by hand or straight from the formula above. Each time this page loads, your own browser runs the calculator on those same numbers and compares. Turn on JavaScript to see the comparison.

See every check
Numbers usedResultWorked out separatelyThis calculator

What this proves: the calculator does the arithmetic of the formula shown, correctly. What it cannot prove: your measurements, or figures such as coverage per bag, waste and spacing, which are typical starting values you can change. Go by the product label and your local code.