How the volumes are worked out
Soil to dig = length × width × depth ÷ 27
Backfill = soil dug − bedding − the space the pipe takes
A worked example
A trench 100 feet long, 12 inches wide and 36 inches deep is 11.1 cubic yards of digging. Six inches of bedding around a 4 inch pipe takes 1.5 cubic yards of sand or fine gravel. The pipe fills 0.3 cubic yards, leaving 9.3 to go back as backfill.
Good to know
- Dug soil swells by 20 to 30%, so the pile beside the trench looks bigger than these figures. It settles again when compacted.
- Call 811 before you dig, and hand dig near any marked line.
- Minimum burial depths for water, gas, sewer and electrical lines are set by code and differ for each. Water lines go below the frost line.
- A trench 5 feet deep or more must be sloped, benched or shored before anyone gets in. Trench collapses are fast and often fatal.
Common questions
What slope does a drain line need?
The drain pipe slope calculator gives the total fall for the length of the run.
How we know this calculator is right
Before this calculator went on the site, 8 answers were worked out separately from its code, by hand or straight from the formula above. Each time this page loads, your own browser runs the calculator on those same numbers and compares. Turn on JavaScript to see the comparison.
See every check
| Numbers used | Result | Worked out separately | This calculator |
|---|
What this proves: the calculator does the arithmetic of the formula shown, correctly. What it cannot prove: your measurements, or figures such as coverage per bag, waste and spacing, which are typical starting values you can change. Go by the product label and your local code.